{"id":7044,"date":"2026-10-30T00:00:47","date_gmt":"2026-10-29T16:00:47","guid":{"rendered":"https:\/\/www.hitekenergy.com\/?p=7044"},"modified":"2026-11-02T15:42:56","modified_gmt":"2026-11-02T07:42:56","slug":"grid-forming-vs-grid-following-inverters-for-battery-energy-storage","status":"publish","type":"post","link":"https:\/\/www.hitekenergy.com\/es\/news\/grid-forming-vs-grid-following-inverters-for-battery-energy-storage\/","title":{"rendered":"Inversores formadores de red frente a inversores seguidores de red para el almacenamiento de energ\u00eda en bater\u00edas  \u00a0"},"content":{"rendered":"<p><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-full wp-image-7038\" src=\"https:\/\/www.hitekenergy.com\/wp-content\/uploads\/2026\/10\/Grid-Forming-vs-Grid-Following-Inverters-for-Battery-Energy-Storage.png\" alt=\"Inversores formadores de red frente a inversores seguidores de red para el almacenamiento de energ\u00eda en bater\u00edas\" width=\"477\" height=\"566\" srcset=\"https:\/\/www.hitekenergy.com\/wp-content\/uploads\/2026\/10\/Grid-Forming-vs-Grid-Following-Inverters-for-Battery-Energy-Storage.png 477w, https:\/\/www.hitekenergy.com\/wp-content\/uploads\/2026\/10\/Grid-Forming-vs-Grid-Following-Inverters-for-Battery-Energy-Storage-253x300.png 253w, https:\/\/www.hitekenergy.com\/wp-content\/uploads\/2026\/10\/Grid-Forming-vs-Grid-Following-Inverters-for-Battery-Energy-Storage-10x12.png 10w\" sizes=\"(max-width: 477px) 100vw, 477px\" \/><\/p>\n<p>El seguimiento de la red y la formaci\u00f3n de la red son los dos m\u00e9todos mediante los cuales el inversor de bater\u00eda puede interactuar con la red de CA. Un inversor seguidor de la red sigue la forma de onda de voltaje existente para gestionar la corriente, mientras que un inversor formador de red genera su propia forma de onda de voltaje. Esto le permite brindar asistencia a la red incluso cuando no hay se\u00f1al externa disponible. Tener una u otra denominaci\u00f3n no garantiza la capacidad de arranque en negro, el derecho a operar en modo isla ni ning\u00fan enfoque particular para la gesti\u00f3n de fallas. Los ingenieros deben elegir el modo de control correcto.<\/p>\n<h2><strong><b>La diferencia de control en una comparaci\u00f3n<\/b><\/strong><\/h2>\n<p>La diferencia se aprecia mejor en el punto de conexi\u00f3n. Las herramientas de seguimiento de red monitorizan la fase actual de la red y, a continuaci\u00f3n, inyectan corriente en el sistema. Las herramientas de formaci\u00f3n de red establecen sus propios objetivos de tensi\u00f3n y frecuencia dentro de l\u00edmites predefinidos. Adem\u00e1s, equilibran la potencia con otras unidades seg\u00fan su configuraci\u00f3n interna. Independientemente del tipo, todo dise\u00f1o requiere protecci\u00f3n de seguridad, l\u00edmites de energ\u00eda, gesti\u00f3n t\u00e9rmica y una l\u00f3gica probada para la conmutaci\u00f3n de modos.<\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"184\"><strong><b>Pregunta de dise\u00f1o<\/b><\/strong><\/td>\n<td width=\"184\"><strong><b>Seguimiento de cuadr\u00edcula<\/b><\/strong><\/td>\n<td width=\"184\"><strong><b>Formaci\u00f3n de cuadr\u00edculas<\/b><\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"184\">Referencia<\/td>\n<td width=\"184\">Sigue la tensi\u00f3n alterna externa<\/td>\n<td width=\"184\">Establece la referencia de voltaje de CA local<\/td>\n<\/tr>\n<tr>\n<td width=\"184\">Objetivo de control t\u00edpico<\/td>\n<td width=\"184\">Corriente o potencia activa y reactiva<\/td>\n<td width=\"184\">Distribuci\u00f3n de voltaje, frecuencia y potencia<\/td>\n<\/tr>\n<tr>\n<td width=\"184\">Comportamiento de red d\u00e9bil<\/td>\n<td width=\"184\">Se basa en una alta calidad de referencia.<\/td>\n<td width=\"184\">Puede servir de referencia si est\u00e1 bien construido.<\/td>\n<\/tr>\n<tr>\n<td width=\"184\">Operaci\u00f3n en la isla<\/td>\n<td width=\"184\">Necesita una fuente de formaci\u00f3n independiente<\/td>\n<td width=\"184\">Funciona con los controles y la seguridad adecuados.<\/td>\n<\/tr>\n<tr>\n<td width=\"184\">Verificaci\u00f3n<\/td>\n<td width=\"184\">Comprobaciones de sincronizaci\u00f3n y flujo actual<\/td>\n<td width=\"184\">Pruebas de estabilidad y compartici\u00f3n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><strong><b>D\u00f3nde funciona bien el seguimiento de cuadr\u00edcula<\/b><\/strong><\/h2>\n<p>Una red el\u00e9ctrica robusta ofrece una se\u00f1al de voltaje y frecuencia constante. En estos casos, un sistema de almacenamiento de energ\u00eda en bater\u00edas (BESS) que sigue la red puede suministrar potencia activa y gestionar la potencia reactiva con facilidad. Cumple sin problemas con la mayor\u00eda de las normas de conexi\u00f3n est\u00e1ndar. Sin embargo, su rendimiento solo es fiable dentro de ciertos l\u00edmites de seguridad y capacidad de la red. No se debe denominar a un dise\u00f1o que sigue la red como \"formador de red\" simplemente porque reacciona r\u00e1pidamente a los cambios de frecuencia o ayuda con la potencia reactiva.<\/p>\n<h2><strong><b>Por qu\u00e9 las redes d\u00e9biles cambian el dise\u00f1o<\/b><\/strong><\/h2>\n<p><em><i> <img decoding=\"async\" class=\"aligncenter size-full wp-image-7039\" src=\"https:\/\/www.hitekenergy.com\/wp-content\/uploads\/2026\/10\/HITEKESS-inverter.png\" alt=\"Inversor HITEKESS\" width=\"557\" height=\"554\" srcset=\"https:\/\/www.hitekenergy.com\/wp-content\/uploads\/2026\/10\/HITEKESS-inverter.png 557w, https:\/\/www.hitekenergy.com\/wp-content\/uploads\/2026\/10\/HITEKESS-inverter-300x298.png 300w, https:\/\/www.hitekenergy.com\/wp-content\/uploads\/2026\/10\/HITEKESS-inverter-150x150.png 150w, https:\/\/www.hitekenergy.com\/wp-content\/uploads\/2026\/10\/HITEKESS-inverter-12x12.png 12w, https:\/\/www.hitekenergy.com\/wp-content\/uploads\/2026\/10\/HITEKESS-inverter-100x100.png 100w\" sizes=\"(max-width: 557px) 100vw, 557px\" \/><\/i><\/em><\/p>\n<p>En un sistema de red deficiente, la tensi\u00f3n fluctuar\u00e1 considerablemente si hay flujo de corriente proveniente del inversor. Si varios sistemas de seguimiento de red operan de forma coordinada, pueden generar interferencias entre s\u00ed debido a sus bucles de enganche de fase. Los dispositivos formadores de red ayudan a estabilizar la tensi\u00f3n y la frecuencia. Sin embargo, estos dispositivos deben configurarse seg\u00fan la red, los generadores y la carga. Cualquier estudio debe analizar las peores condiciones de la red.<\/p>\n<ul>\n<li>Determinar los niveles m\u00ednimos de cortocircuito y el rango de impedancia de la red.<\/li>\n<li>Busque fluctuaciones de voltaje y frecuencia despu\u00e9s de grandes cambios en la carga o la potencia.<\/li>\n<li>Compruebe c\u00f3mo funciona la unidad con otros inversores y rel\u00e9s de seguridad.<\/li>\n<li>Defina qu\u00e9 sucede cuando el sistema de almacenamiento de energ\u00eda en bater\u00edas (BESS) alcanza su l\u00edmite de corriente o de estado de carga (SOC).<\/li>\n<li>Confirma qui\u00e9n se encarga de actualizar los modelos y la configuraci\u00f3n de control.<\/li>\n<\/ul>\n<h2><strong><b>La formaci\u00f3n de la cuadr\u00edcula no implica autom\u00e1ticamente un inicio en negro.<\/b><\/strong><\/h2>\n<p>Grid formation starts from scratch and involves a lot of procedures. First, you will require back-up power, available DC power, and ability to start the PCS. Then, there is magnetization of transformers, load pickup, and other procedures. <strong><a href=\"https:\/\/www.hitekenergy.com\/es\/inverter\/atess-battery-inverter-pcs1500hv\/\">Grid-forming PCS<\/a><\/strong> will give an AC signal for formation, however, the site should be able to handle that initial surge of power. The procedure is not supposed to exceed the limits of battery or current. It is important to test it on practice.<\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"184\"><strong><b>Escenario<\/b><\/strong><\/td>\n<td width=\"184\"><strong><b>Pregunta para la especificaci\u00f3n<\/b><\/strong><\/td>\n<td width=\"184\"><strong><b>Evidencia de aceptaci\u00f3n<\/b><\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"184\">energizaci\u00f3n de autobuses muertos<\/td>\n<td width=\"184\">\u00bfPuede el PCS alimentar el bus y el transformador?<\/td>\n<td width=\"184\">Registros de datos de voltaje y corriente de irrupci\u00f3n<\/td>\n<\/tr>\n<tr>\n<td width=\"184\">Recogida de carga<\/td>\n<td width=\"184\">\u00bfCu\u00e1nta carga se puede a\u00f1adir de una sola vez?<\/td>\n<td width=\"184\">Datos de recuperaci\u00f3n de frecuencia y voltaje<\/td>\n<\/tr>\n<tr>\n<td width=\"184\">Operaci\u00f3n en paralelo<\/td>\n<td width=\"184\">\u00bfC\u00f3mo se reparte la carga?<\/td>\n<td width=\"184\">Tendencias P y Q con otras unidades<\/td>\n<\/tr>\n<tr>\n<td width=\"184\">Retorno a la cuadr\u00edcula<\/td>\n<td width=\"184\">\u00bfC\u00f3mo se reincorpora a la red?<\/td>\n<td width=\"184\">Cambio de modo y registros de seguridad<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><strong><b>Los l\u00edmites actuales y la protecci\u00f3n siguen siendo importantes.<\/b><\/strong><\/h2>\n<p>La corriente del inversor tiene l\u00edmites estrictos debido al calor y a las especificaciones de los chips. En caso de cortocircuito, una unidad formadora de red podr\u00eda no proporcionar la misma corriente de falla a largo plazo que un generador convencional. Los planes de seguridad deben utilizar los modelos de falla espec\u00edficos proporcionados por el fabricante. Debe verificar el transformador, los interruptores y la configuraci\u00f3n de los rel\u00e9s como un sistema \u00fanico. Esto es fundamental para instalaciones aisladas con m\u00faltiples fuentes de alimentaci\u00f3n.<\/p>\n<h2><strong><b>Los l\u00edmites de energ\u00eda de las bater\u00edas afectan a los servicios de la red el\u00e9ctrica.<\/b><\/strong><\/h2>\n<p>Generar voltaje es una tarea de software, pero mantener el flujo de energ\u00eda requiere energ\u00eda almacenada real y espacio en el PCS. Si un operador utiliza toda la bater\u00eda para operar pero promete asistencia de frecuencia, es posible que no haya suficiente reserva de SOC para una emergencia. Debe establecer una pol\u00edtica clara para las reservas. Defina cu\u00e1nto duran y c\u00f3mo se recuperan. El BMS debe informar al PCS y al EMS sobre los l\u00edmites de corriente para que no soliciten energ\u00eda que no est\u00e1 disponible.<\/p>\n<p>La forma en que el <a href=\"https:\/\/www.hitekenergy.com\/es\/news\/bms-vs-ems-vs-pcs-in-a-battery-energy-storage-system\/\"><strong><u><b>BMS, EMS y PCS<\/b><\/u><\/strong><\/a>\u00a0La colaboraci\u00f3n es fundamental a la hora de establecer estas normas.<\/p>\n<h2><strong><b>Seleccione por escenario operativo, no por etiqueta.<\/b><\/strong><\/h2>\n<p>A standard factory site might only need basic power flow and reactive help without ever leaving the grid. A remote microgrid, however, needs the <strong><a href=\"https:\/\/www.hitekenergy.com\/es\/solution\/contaianerized-bess\/\">BESS<\/a><\/strong> to start the AC bus and lead a diesel generator. Some utility sites need grid-forming traits only when the main grid is weak. For every project, clearly state who provides the voltage signal, how the system switches modes, and who can change the settings.<\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"184\"><strong><b>Caso de proyecto<\/b><\/strong><\/td>\n<td width=\"184\"><strong><b>Punto de partida probable<\/b><\/strong><\/td>\n<td width=\"184\"><strong><b>Estudio cr\u00edtico<\/b><\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"184\">C&amp;I de red robusta<\/td>\n<td width=\"184\">A menudo, seguir la cuadr\u00edcula es suficiente.<\/td>\n<td width=\"184\">Calidad de la conexi\u00f3n y de la energ\u00eda<\/td>\n<\/tr>\n<tr>\n<td width=\"184\">microrred aislada<\/td>\n<td width=\"184\">Necesita una fuente de formaci\u00f3n<\/td>\n<td width=\"184\">Cargar pasos y arranque en negro<\/td>\n<\/tr>\n<tr>\n<td width=\"184\">Sistema de almacenamiento de energ\u00eda (BESS) para redes el\u00e9ctricas d\u00e9biles<\/td>\n<td width=\"184\">Revise ambos modos de control<\/td>\n<td width=\"184\">Rel\u00e9s de estabilidad y seguridad<\/td>\n<\/tr>\n<tr>\n<td width=\"184\">Transici\u00f3n de copia de seguridad<\/td>\n<td width=\"184\">La l\u00f3gica de conmutaci\u00f3n es vital<\/td>\n<td width=\"184\">Aislamiento y resincronizaci\u00f3n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><strong><b>Qu\u00e9 preguntar durante la adquisici\u00f3n y las pruebas<\/b><\/strong><\/h2>\n<p><em><i> <img decoding=\"async\" class=\"aligncenter size-full wp-image-7041\" src=\"https:\/\/www.hitekenergy.com\/wp-content\/uploads\/2026\/10\/inverter.png\" alt=\"inversor\" width=\"549\" height=\"477\" srcset=\"https:\/\/www.hitekenergy.com\/wp-content\/uploads\/2026\/10\/inverter.png 549w, https:\/\/www.hitekenergy.com\/wp-content\/uploads\/2026\/10\/inverter-300x261.png 300w, https:\/\/www.hitekenergy.com\/wp-content\/uploads\/2026\/10\/inverter-14x12.png 14w\" sizes=\"(max-width: 549px) 100vw, 549px\" \/><\/i><\/em><\/p>\n<p>Solicite una lista clara de todos los modos compatibles y cu\u00e1ndo se activan. El proveedor debe proporcionar modelos probados, datos de corriente de falla y l\u00edmites de corriente. Tambi\u00e9n debe mostrar c\u00f3mo el sistema cambia de modo y proporcionar planes de prueba del sitio. No basta con afirmar que es compatible con la red el\u00e9ctrica. Necesita un estudio que demuestre que el sistema se mantiene estable con su cableado espec\u00edfico y otras unidades de alimentaci\u00f3n.<\/p>\n<ul>\n<li>Establezca los rangos exactos de voltaje, frecuencia y niveles de ca\u00edda.<\/li>\n<li>Enumere los l\u00edmites de potencia activa y reactiva en todos los puntos clave.<\/li>\n<li>Describe c\u00f3mo la unidad limita la corriente y reacciona ante fallos.<\/li>\n<li>Prueba c\u00f3mo se comporta al alternar entre estar conectado a la red y estar aislado.<\/li>\n<li>Mantenga un registro del software y la configuraci\u00f3n utilizados para la aprobaci\u00f3n final.<\/li>\n<\/ul>\n<h2><strong><b>Acerca de HITEK ENERGY<\/b><\/strong><\/h2>\n<p>HITEK ENERGY CO., LTD es un fabricante de productos de almacenamiento de energ\u00eda para empresas e industrias. Sus sistemas ofrecen una base para combinar bater\u00edas y controles PCS seg\u00fan las necesidades espec\u00edficas de cada instalaci\u00f3n. Si necesita funciones de formaci\u00f3n de red, debe verificarlas con la configuraci\u00f3n PCS elegida y los estudios del proyecto. Conocer la marca no garantiza que la funci\u00f3n espec\u00edfica sea adecuada para su instalaci\u00f3n.<\/p>\n<p>Los compradores pueden consultar el HITEKESS\u00a0<a href=\"https:\/\/www.hitekenergy.com\/es\/inverter\/\"><strong><u><b>Cartera de sistemas de almacenamiento de energ\u00eda<\/b><\/u><\/strong><\/a>\u00a0para iniciar su revisi\u00f3n t\u00e9cnica.<\/p>\n<h2><strong><b>Conclusi\u00f3n<\/b><\/strong><\/h2>\n<p>El control de seguimiento de red utiliza la se\u00f1al de CA actual para mantenerse sincronizado. El control de formaci\u00f3n de red genera su propia se\u00f1al para dar soporte a sistemas d\u00e9biles o aislados. Seleccione el modo adecuado seg\u00fan el funcionamiento real del sistema. A continuaci\u00f3n, verifique la estabilidad, los l\u00edmites de corriente y las reservas de bater\u00eda mediante modelos reales y pruebas in situ.<\/p>\n<h2><strong><b>Preguntas frecuentes<\/b><\/strong><\/h2>\n<h3><strong><b>\u00bfPuede un sistema de almacenamiento de energ\u00eda en bater\u00edas (BESS) que siga la red el\u00e9ctrica funcionar en una isla?<\/b><\/strong><\/h3>\n<p>Solo si existe otra fuente para regular el voltaje y la frecuencia. El plan integral de la isla debe estar completamente dise\u00f1ado.<\/p>\n<h3><strong><b>\u00bfTodos los inversores formadores de red proporcionan arranque en negro?<\/b><\/strong><\/h3>\n<p>No. El arranque en negro requiere las bater\u00edas adecuadas, transformadores y un plan cuidadoso para agregar cargas.<\/p>\n<h3><strong><b>\u00bfLa formaci\u00f3n de redes es siempre mejor para un sistema de almacenamiento de energ\u00eda en bater\u00edas (BESS)?<\/b><\/strong><\/h3>\n<p>No. Depende de la red el\u00e9ctrica. Una red urbana robusta a menudo no necesita estas caracter\u00edsticas adicionales.<\/p>\n<h3><strong><b>\u00bfQu\u00e9 deben verificar los compradores en una reclamaci\u00f3n relacionada con la formaci\u00f3n de cuadr\u00edculas?<\/b><\/strong><\/h3>\n<p>Verifique los modos, modelos, l\u00edmites de corriente y c\u00f3mo maneja la conmutaci\u00f3n y la seguridad.<\/p>\n<p>&nbsp;<\/p>\n<h2><strong><b>SISTEMAS DE ALMACENAMIENTO DE ENERG\u00cdA EN BATER\u00cdAS HITEKESS<\/b><\/strong><\/h2>\n<h3><b>1.\u00a0<\/b><strong><b>Energ\u00eda renovable Hitek Mejor inversor de 250 kW fuera de la red en la red H\u00edbrido 50 kW 100 kW 150 kW 250 kW Costo Sistema completo de energ\u00eda solar Sistema de paneles solares todo en uno<\/b><\/strong><\/h3>\n<p><strong><b>Modelo: HT250KW-HY<\/b><\/strong><\/p>\n<h3><b>2.\u00a0<\/b><strong><b>Paneles solares h\u00edbridos fuera de la red de 100 kW, 200 kW, 250 kW, 500 kW y 1 MW. Sistema solar comercial completo de 1 megavatio con bater\u00eda de respaldo de litio de 500 kWh, 1 MWh y 2 MWh.<\/b><\/strong><\/h3>\n<p><strong><b>Modelo:<\/b><\/strong><strong><b>HT500KW-HY<\/b><\/strong><\/p>\n<h3><b>3.\u00a0<\/b><strong><b>Soporte de red de dise\u00f1o profesional 500kWh 800kWh 1MWh 2MWh Sistema completo de almacenamiento de energ\u00eda en bater\u00edas en contenedores 500kWh 1MWh<\/b><\/strong><\/h3>\n<p><strong><b>Modelo: HT500KW-HY<\/b><\/strong><\/p>\n<h3><b>4.\u00a0<\/b><strong><b>Sistema de energ\u00eda solar Hitek de 100 kW, 200 kW, 250 kW y 500 kW, con o sin conexi\u00f3n a la red, todo en uno. Contenedor de 20 pies. Sistema de almacenamiento de energ\u00eda con bater\u00eda LiFePO4 de 500 kW y 1 MWh.<\/b><\/strong><\/h3>\n<p><strong><b>Modelo: HT-500\/1MWH-EC<\/b><\/strong><\/p>\n<h3><b>5.\u00a0<\/b><strong><b>Sistema h\u00edbrido en contenedor Hitek Full de 100 kW, 200 kW, 250 kW y 500 kW para exteriores e interiores. Sistema solar de 500 kW. Sistema de energ\u00eda solar comercial de 1000 kWh con bater\u00eda.<\/b><\/strong><\/h3>\n<p><strong><b>Modelo: HT-500\/1000-EC<\/b><\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Grid following and grid forming are the two methods by which the battery inverter can interact with the AC grid. Grid following inverter follows the existing voltage wave form for managing the current while a grid forming inverter generates its own voltage waveform. It enables it to provide help to the grid even when there [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":7038,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-7044","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.hitekenergy.com\/es\/wp-json\/wp\/v2\/posts\/7044","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hitekenergy.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.hitekenergy.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.hitekenergy.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.hitekenergy.com\/es\/wp-json\/wp\/v2\/comments?post=7044"}],"version-history":[{"count":4,"href":"https:\/\/www.hitekenergy.com\/es\/wp-json\/wp\/v2\/posts\/7044\/revisions"}],"predecessor-version":[{"id":7049,"href":"https:\/\/www.hitekenergy.com\/es\/wp-json\/wp\/v2\/posts\/7044\/revisions\/7049"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hitekenergy.com\/es\/wp-json\/wp\/v2\/media\/7038"}],"wp:attachment":[{"href":"https:\/\/www.hitekenergy.com\/es\/wp-json\/wp\/v2\/media?parent=7044"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.hitekenergy.com\/es\/wp-json\/wp\/v2\/categories?post=7044"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.hitekenergy.com\/es\/wp-json\/wp\/v2\/tags?post=7044"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}